The details
xxxxxx
Burton, Australia
>400ha
2014-2016
Over three years, via Thiess, our specialists led the successful completion of this major rehabilitation campaign across a large, complex series of waste dumps. The scope included optimised landform design, profiling, drainage construction and topsoil placement, with exceptional outcomes, delivered within budget, ahead of schedule and to all specifications. Strategies included rigorous quality control processes; detailed materials movement analysis that ensured material was handled once, straight into final position; and significant construction efficiencies through dozer push optimisation with less equipment. The result was an efficient, compliant final surface and significant savings from reduced complex landform construction costs.